Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
French
US English (US)
GB English (UK)
FR French
DE German
NL Dutch
  • Accueil
  • Ostara Original
  • Ordinateur de bureau
  • Ordres de travail
  • Flux de processus des ordres de travail
  • Actions de l'agent : Réactives, Devis, PPM, Audit

Lier l'ordre de travail > Créer un nouvel ordre de travail

Written by Ostara Systems

Updated at December 2nd, 2025

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Nexus
    Page de connexion Carrelage Menu principal Menu Avatar Filtration Fonctionnalité Commune
  • Mobile
    Actifs Paramètres Autorisations Ordres de travail
  • Ostara Original
    Ordinateur de bureau Portail
+ Plus

Un utilisateur peut souhaiter lier un ordre de travail à un nouvel ordre de travail. Quatre options sont disponibles : lier un ordre de travail « Réactif », un ordre de travail « Devis », un ordre de travail « Audit » ou un ordre de travail « Achat ». Pour ce faire, sélectionnez cette option dans la liste des actions de l’agent et choisissez le type de nouvel ordre de travail à créer. Une fois la sélection effectuée, l’utilisateur est guidé tout au long du processus de création d’un nouvel ordre de travail .

Was this article helpful?

Yes
No
Give feedback about this article

Articles associés

  • Introduction à la génération d'ordres de travail PPM
  • Envoi par courriel des ordres de travail PPM
  • Introduction aux ordres de travail
Expand